Home header left
| Login Help

 

 

AD Issued on Astir CS and Std III 2010-15-06 water fittings.

This AD applies to the gliders fitted with water ballast, certified in any category.

This AD requires within 30 days after September 9, 2010 (the effective date of this AD) and repetitively thereafter at intervals not to exceed 12 months, inspect the bonding between the water ballast system hose connectors and the fuselage wall connectors for correct and tight connection.

The effective date of this AD is September 9, 2010.   

The full text of the AD can be found at this LINK.

C. Brickner, Govt. Liaison Committee

Posted: 9/10/2010


Government Liaison Committee 

Search Posts

Recent Posts

Legal Notice

The SSA policy on member posting is located here