Home header left
| Login Help

 

 

AD Issued on Stemme S10-VT 2010-11-08 fuel fittings and clamps.

This is an update to AD 2007-0315-E regarding leaks in the fuel lines in the gear well, replacing plastic T and Y fittings and single-ear clamps. 

 This AD reiterates replacing all plastic line fittings, all hose clamps and doing a mandatory leak check before further flight before July 6, 2010.  Even if you have replaced some fittings and clamps, a new leak check is required.

The effective date of this AD is July 6, 2010.

The full text of the AD can be found at this LINK.

C. Brickner, Govt. Liaison Committee

Posted: 6/24/2010


Government Liaison Committee 

Search Posts

Recent Posts

Legal Notice

The SSA policy on member posting is located here